Project Overview

Project

Completion of Water Treatment Unit (WTU) – CDU4

End User

South Refineries Company (Ministry of Oil)

Client

South Refineries Company

Location

Iraq

Plant Type

Refinery – Crude Distillation Unit (CDU4)

Project Nature

Completion, supervision and automation of an existing water treatment plant

Enermove was engaged to complete and bring into operation the Water Treatment Unit (WTU) of the CDU4 refinery project, following the interruption of the original EPC contractor.

The project involved a complex scenario where part of the plant had been installed but never commissioned, with missing documentation, potential equipment degradation, and uncertain system conditions.

Enermove acted as technical authority, system integrator and project coordinator, ensuring the safe completion, automation, and start-up of the plant.

Scope of Supply

Enermove delivered a comprehensive, integrated scope covering engineering, supervision, procurement, and automation:

Engineering & Documentation Recovery

Verification, completion, and reconstruction of engineering documentation, including As-Built deliverables

Site supervision of mechanical, electrical and instrumentation completion, including pre-commissioning, commissioning and start-up

Supply of spare parts, replacement of missing/damaged items, and renewal of obsolete process components

Development and implementation of PLC control software for all main treatment packages

Interface and integration with plant DCS for centralized monitoring and control

Enermove Challenge

  • Restarting a project after EPC contractor abandonment
  • Managing incomplete engineering and uncertain plant conditions
  • Handling equipment degradation due to long storage
  • Coordinating multiple local subcontractors without direct control
  • Mitigating unexpected technical and site-related issues 

Enermove Performance

Enermove successfully delivered:

  • Full technical recovery of engineering documentation
  • Effective supervision and coordination of site activities
  • Completion and commissioning of the Water Treatment Unit
  • Implementation of reliable automation and control systems
  • Seamless integration with plant DCS

Key Facts & Numbers

Location

Iraq

Facility Type

Refinery – CDU4

Solution Type

Water Treatment Plant Completion & Automation

Process Technologies

Reverse Osmosis · Ultrafiltration · CEDI · Sand Filtration · Sludge Treatment

Automation

PLC Development · Functional Specifications · DCS Integration

Project Duration

Approx. 180 working days

Enermove Role

Engineering Integrator · Site Supervisor · Automation Developer

Key Technology Vendors

We are always committed to working with leading technology vendors to deliver reliable and high-quality solutions.
nitto hydrautics

Nitto

Dupont

Dupont

Tavola disegno 12@200x 8

PureWater

Tavola disegno 12@200x 8

Alley

Key Value Delivered

  • Recovery and completion of a critical refinery unit
  • Reduction of technical and execution risks in a brownfield scenario
  • Reliable and fully integrated automation system
  • Efficient coordination between Owner and contractors
  • Safe and structured plant start-up

Other Project